Gas line work done.
So... PSE has connected up the new gas line, switched it over, relit the water heater, phone line has been repaired and switched back, the various holes in our cul-de-sac are filled in an patched (in theory, we're due for a street repaving soon; we'll see how that goes). There is one remaining hole in the lawn and the guy I talked to was not entirely clear why it was still open, but it's not near anything that matters (i.e., apart from the gas line; it was a place where the mole/digger-thingie needed to change direction), knock wood.
And now I get a call from Megapath that CenturyLink is apparently eliminating the legacy Speakeasy circuits and some More Stuff needs to happen.
<< Home